[To view individual action points go to MyActions.cfm for outstanding actions and to see all actions done and outstanding see AllMyActions.cfm (note each of the columns are sortable).Also created an Intranet XHostIntranet, and started a document library see forum]
| A/P 1/1 | A/P: RC to form, IR and RC as directors | |
| RC | 14-Feb-2000: Meeting held with accountants. Company formed
officially 15-Feb. Company number 3925889 Directors: IR, CSC. Secretary: KK The initial holding of two shares has been allocate one for IR, one for CSC. Accountant suggested given the company make-up we order 10,000 shares and issue ~ 1000. Need to decide on the allocation Creating Intercompany holding account so d7 can pay bills for Xhost in the interim. (Need to decide on Bankers. No strong opinions except IR doesn't want RBS!). Resulting A/Ps (will create as separate A/Ps): 28-Feb: Agreed overall control not an issue, 1200 shares @ £100 to be prebought by us. Another 30 to be offered for sale. IR - to return form tonight. Going to keep to his own assessment. Still waiting VAT registration 2-Mar: KK to call our bank tomorrow. 20-Mar: IR posting form tonight. IR doesn't want self assessment. Still awaiting VAT. KK chasing. Share division agreed as per discussions at face to face meeting. Need to do split..45:45:30:30 - 1200
|
|
| A/P 1/2 | A/P 1/2 - IR services of costs and charges, basic Xhost site so customers can sign up (and pay up!). | |
| IR | Need agreement on costs and services before this can be completed
12-Feb: Basic site up, protected directory underneath needed. CSC. 14-Feb: IR Loading tomorrow. 3-Mar: IR loading site. Will then want testing. D/L shareware for credit card validation.. CSC to check for freebie credit card number validation routine.. 20-Mar: IR loading charge generating site for us to see tonight. C/F |
|
| A/P 1/3 | A/P 1/3 - David suggests we try to get us added as an approved hosting service to home.intra pages.. A/P: DC | |
| DC | 7-Feb: The home.intra recommended supplier bit is really designed
for web designers rather than hosters but this is still a good idea and
we will leave the action point to remind s what a good idea it is!
14-Feb: C/F pending us getting started 3-Mar:C/F 13-Mar: C/F 20-Mar: C/F as 14-Feb. |
|
| A/P 1/5 | A/P 1/5 - RC/CC to investigate credit card (card not present transactions) | |
| Closed | 07-Feb-2000: Contacted Cardnet who are sending paperwork for
card not present authority.
11-Feb-2000: Forms have arrived. 25-Feb: Forms have been sent in - waiting response. 3-Mar: Chased 13-Mar: Chased again and via bank 20-Mar: Now validated for all (except Amex). Mailed down domain registration, john regnt?? Forwarding to XHost parking 6x10. ??Investigate Gradwell reseller (so that Gradwell involvement is invisible to customers) Done. |
|
|
A/P 1/4 Closed
|
|
|
|
A/P 1/5 Closed
|
|
|
|
A/P 1/6 Closed
|
|
|
|
A/P 1/7 Closed
|
|
|
| A/P 1/8 | A/P 1/8 - IR to notify CSC of confirmed date for face-to-face meeting in early Feb in sufficient time to invite Gavin | |
| IR |
14-Feb: IR thinks should defer the meeting until Xhost is up and running so Gavin can see what we're about. Action to be C/F pending this. 3-Mar: C/F 13-Mar: C/F 20-Mar: C/F as 14-Feb. |
|
| A/P 1/9 | A/P 1/9 - IR - suggested working out hosting plans (for our existing hosting customers) | |
| IR | 14-Feb: dependant on charges. IR thinks all fit bronze plan,
though with price rise.
Agreed that they will receive more for their money so that the price rise is not an issue. Also discussed the option of offering to hold old prices for them (to help keep customer numbers up and as a thank you for their business). 3-Mar: Pilot Andy L's latest customer. Costs to register org (?org.uk) 20-Mar: KK confirmed costs to register .org same as .co.uk Agreed to use existing customers to database as test of codes etc.. Pending IR confirming by email successful load of new site.
|
|
| A/P 1/10 | A/P 1/10 - to provide skills listing for proposal document | |
| All | 14-Feb: Thread in forums still not started?
Discussion about the Proposal document.. Purpose and composition. CSC said it would be useful to show to Gavin, proposed backers, bankers, other significant players etc. 3-Mar: C/F 13-Mar: C/F 20-Mar: C/F |
|
| A/P 1/11 | A/P 1/11 - RC - Work out costs for lines and DNS registration. put in Xhost directory on Ealing | |
| KK | 24-Jan-00: xhost.co.uk ordered with ip 195.40.15.100 and MX
to ealing mail server. Netbenefit now charge 65GBP+VAT for domains which
means we should charge 85-90+VAT... Initial line cost estimates made (see
shared file area on ealing).
7-Feb: C/F 07-Feb-2000: www.host.co.uk and mail.xhost.co.uk operating and access to the xhost web root set up. 14-feb: Put figures in spreadsheet 3-Mar: KK to check costs are up-to-date. and includes org org.uk. Trial DNS setup? 13-Mar: C/F 20-Mar: First draft document in forums.. As to running our own DNS servers - got software, now wants to trial running machines. KK suggests using gradwell in interim (?whether we can be proper resellers and sell transparently?) |
|
|
A/P 1/12 Closed
|
|
|
| A/P 1/13 | A/P 1/13 - CSC to investigate Data Protection registration. | |
| CSC | 7-Feb: Pending Company formation
14-Feb: C/F 3-Mar: Form printed.. Need cheque! 13-Mar: C/F pending cheque! 20-Mar: C/F as 13-Mar |
|
| A/P 2/1 | A/P 2/1 - IR to put range of services, plan types - cf fax into spreadsheet and analyse for breakpoints - 50% bronze, when cheaper to go to next plan. | |
| IR | 7-Feb: Started, spreadsheet pending. Issue getting complicated?
New action from meeting 4 to review prices.
14-Feb: CSC offered spreadsheet assistance. C/F 3-Mar: C/F 13-Mar: C/F 20-Mar: C/F |
|
| A/P 2/2 | A/P 2/2 - Research ecommerce packages/templates - CSC/KK ?Ads package? | |
| CSC/KK | 14-Feb: IR thinks actinic is the best lead. CSC to review.
07-Feb-2000: After discussion on conference call decided to try and become AbleCommerce (CF based) reseller. Drumbeat was mentioned as a tool if this facility should become required in house (ASP based). 24-Jan:DC sent fax. 15% of every bureau transaction to the company. Concern about hidden charges in the package. Able Commerce advertising for European resellers, have to buy upfront 5 store front licences. So could offer storefronts on a town (regional basis looks good). Looking at Govan, with small ecommerce package and their own shop fronts. KK asked how complicated. 25-Feb: Storefront bought for simple fornt ends ofr customers. Still need to make a final decision on our own package. Contenders include AbleCommerce, IHTML. CSC concerned that it is difficult to evaluate. 3-Mar: Actinic web front end (catalogue application) Verisign & merchant account.. 13-Mar: Decision to use Netbanx for transaction processing. Rest still confused? Strength in offering customer choice so better to support many - concern with licencing and co-existence (and effect on the standard build!). We have licenced iHTML - so is that the best choice for our own use? 20-Mar: Think should charge more for setup and less for maintenance as setup not trivial. IR sending down so we can see. New A/P CSC to look at productising ihtml and selling on.. Need one storefront so can register as partner with Microsoft - DC progressing. |
|
|
A/P 2/2 Closed
|
|
|
|
A/P 2/3 Closed
|
|
|
| A/P 2/4 | A/P 2/4 - DC Investigate certification as Verisign/BT/Which etc? | |
| DC | 7-Feb: Make requirement for ecommerce.
DC to produce supplementary document with prices. 14-Feb: Results to go into forum, waiting for Trustwise to get back. Into forum by end of week. ?Trustwise or go to Verisign direct. 3-Mar: Agreed Verisign.. DC to register. 13-Mar: C/F 20-Mar: BT too expensive, Verisign cheaper. KK concerned at information we have to provide to Dun & Bradstreet in order to be registered. However, it was agreed we would go for DUN registration. New A/P KK to provide details to Dun |
|
|
A/P 2/5 Closed
|
|
|
|
A/P 2/6 Closed
|
|
|
| A/P 2/7 | A/P 2/7 - Callback services - CSC to check prices, may do as a future development.. | |
| CSC | 14-Feb: Issues in that this relies on having a dedicated person/team
to answer the phones.
Discussion of option of using a call centre but concern that this may create a bad impression with customers (as well as cost issues). Still an interesting option and may offer as future development. C/F 3-Mar: C/F 13-Mar: CSC investigated http://www.realcall.net/ who, interestingly, seem to be a Cold Fusion and iHTML shop. 20-Mar: C/F as probably want to do eventually but all agreed not practical in the short term. It was suggested that we do our own callback button which sends email.... |
|
| A/P 2/8 | A/P 2/8 - cost of logo registration - KK to ask Phil? | |
| KK/NL | NL taking as worked for marketing company for six weeks. So
joining Russell on AP 2/8 _Trademark_
14-Feb: NL not present at meeting. C/F 15-Feb-2000: Emailed Phil re what CYBERIA did. 3-Mar: Pending response from Phil and IP woman returning from holiday. C/F 13-Mar: C/F 20-Mar: C/F |
|
| A/P 2/9 | A/P 2/9 - IR to do logo and letterhead/graphics comp slips, a4 letterheads, businesscards, a4 folders.. | |
| IR | 7-Feb: IR has a printer who he believes can offer a competitive
rate. Pending phone numbers etc
IR suggested model on Easynet flyers!! (CSC/KK to get one?) 14-Feb: Waiting VAT registration & phone numbers. IR to put put mock
up for all to see. 3-Mar: C/F 13-Mar: C/F 20-Mar: Pending VAT number... KK to chase tomorrow. KK pointed out all official emails must have full company details. |
|
|
A/P 2/10 Closed
|
|
|
|
A/P 2/11 Closed
|
|
|
| A/P 2/12 | A/P 2/12 - Search engine registration - cost vs offer as service differentiator.. CSC investigate costs. | |
| CSC |
7-Feb: C/F Altavista claim to use Scott Danister's Submit It! service http://www.submit-it.com/
© MS!!! $59 for 2 URLs (Minimum License) Each web page announced = 1 URL and Net Creations' Postmaster services - which has been withdrawn!! The free trial is still available but the full product has been dropped. http://www.netcreations.com/postmaster/registration/try.html For promoting ourselves, there are the various search engine afiliate programs which are widely believed to increase your chances of a better ranking in the search engines too. There's a lot of FUD about this stuff though! I've also discovered that a lot of the search engines are using data
from the Open Directories project - http://www.dmoz.org/ which goesback
to the old ideals of mutual cooperation and networking and encourages
you to become an editor on their behalf! 3-Mar: Conference call agreed that they are expensive, may not work and may raise customers' expectations unrealistically. Decided to change this action into producing a 'How to market website (members only section)' to go into the web site. 13-Mar: C/F 20-Mar: Agreed as are doing after we're live. CSC documenting search engine suggestions. C/F |
|
| A/P 3/1 | A/P 3/1 - NL to provide paper procedures | |
| NL |
14-Feb: NL not present at meeting, but IR said have got it, will add to forum 3-Mar: What got is going onto forum. Rest is ongoing. 13-Mar: C/F 20-Mar: C/F. NL waiting for requested information. Drafts have been added to document library... ?CSC to check that they have been added as documentation links in 3DS. |
|
|
A/P 3/2 |
|
|
|
A/P 3/3
Closed |
|
|
| A/P 3/4 | A/P 3/4 KK to review email services. rethought email situation re not offering incoming mail. Think should do. | |
| KK | 07-Feb-2000: Email services (in and out) WILL be part of Xhost
service. Level of offerings to be agreed (cf webhost.htm).
7-Feb: Agree it is a good idea. ?Pricing? Needs to be added to IRs document. IR suggesting numbers included in cost of plan, more at additional costs. 14-Feb: IR asked about list server, adding pricing to site. CSC/KK confirmed SL mail has builtin List Server and we also have licence for the full product. http://docs.seattlelab.com/listserver.asp 17-Feb-2000: SLlist installed and SLmail upgraded to version 4. Still problems with EMurl. 3-Mar: Installing tonight. 13-Mar: Installed. Still query about pricing mailing list services? 20-Mar: IR suggested we sell Emurl.. A/P CSC look at xhosting EMUrl front end so we can sell...... Also want a one sheet how to for each product - send to NL.. |
|
| A/P 3/5 | A/P 3/5 - CSC/KK to think about phone/fax numbers for XHost. | |
| CSC/KK | Done some thinking and discussing. Considering how relatively
little it will cost, think that XHost should have its own phone/fax numbers
(though probably use Café's postal address) making it easier to split
from the café in the future if required. Physically the phone is
likely to be in the café.
7-Feb: Agreed at meeting XHost will have own numbers, waiting for Company formation. 14-Feb: DC suggested ensure whatever numbers obtained we also buy a divert service to enable transparency and increase cover. 25-Feb: Need to decide on a company and place order. 7-Mar: Agreed. Suggested we use the existing ISDN line (may investiage possibilty of buying a more memorable number for use though. C/F A/P 7/6 15-Mar: Issue with ISDN line confirming exisitng numbers? 20-Mar: Need to take TA to cafe and ensure at least an answering machine is atached. 22-Mar: Done. Need processes for staff - script or some such and phone numbers (cf SS action 7/6) |
|
| A/P 3/6 | A/P 3/6 - DC to start discussion on forums re copyright and legal position also wrt to adult content.. | |
| Closed | 7-Feb: Anything to add to terms and conditions DC posted draft.
No adult content - professional site.. May change mind later, may for XXXHost.. ;) 14-Feb: Uncertainty as to where the Legal document is in the forum. (DC had to leave meeting, DC to check). 7-Mar: Legal document at http://www.xhost.co.uk/policies.htm 20-Mar: KK raised issue on ownership of pages.. CSC still concerned that anti SPAM and TOS clauses are strong and legally watertight. Closed? |
|
| A/P 3/7 | A/P 3/7 - KK to 'protect' support email accounts so only available to members. (need to ensure comply with RFCs) | |
| KK |
7-Feb: Pending account creation and idea of user creation procedures. 13-Mar: C/F 20-Mar: C/F |
|
|
A/P 3/8
Closed |
|
|
| A/P 3/9 Closed |
|
|
|
A/P 4/1
Closed |
|
|
|
A/P 4/2
Closed |
|
|
|
A/P 4/3
Closed |
|
|
|
A/P 4/4
Closed |
|
|
|
A/P 4/6
Closed |
|
|
| A/P 5/1 | All | A/P 5/1: Costs - everyone to put all that they're providing into the forum. |
| All |
7-Mar: C/F 13-Mar: C/F 20-Mar: C/F |
|
|
A/P 5/2
Closed |
|
|
| A/P 5/3 | DC | A/P 5/3: DC to investigate Front Page Web Bot ecommerce transactions |
| Closed |
7-Mar: C/F 13-Mar: C/F 20-Mar: Up and running. Closed. |
|
| A/P 5/4 | KK | A/P 5/4: KK to get bank accounts.. Not RBS!! |
| KK |
24-Feb-2000: Still awaiting Xhost documents from Companies House. Following this up with JPC who will call back. 7-Mar: C/F 13-Mar - met with Bank, forms should be here shortly. C/F 20-Mar: Pending Ian's form!! C/F |
|
| A/P 5/5 | KK | A/P 5/5: KK to register hazelbank DNS with Gradwell. |
| Closed. |
14-Feb: IR raised query on payment methods - up-front vs bill through.
17-Feb: Hazelbank names parked with Gradwell via d7. Cost GBP240 paid up front by d7 then plus 10% agency fee and in arrears to Xhost. |
|
| A/P 6/1 | A/P 6/1 : Storefront setup wasn't trivial, took 3 days to set up. DC to document. Issue with how to price if setup non-trivial? | |
| DC |
13-Mar: C/F 20-Mar: C/F |
|
| A/P 6/2 | A/P 6/2 : IR feeling site is too big for one person. CSC suggested split into modules and assign ownership of areas. IR to come up with splitting proposal ?via forums? | |
| IR | 13-Mar: C/F
20-Mar: C/F |
|
| A/P 6/3 | A/P 6/3 : CSC to check for freebie credit card number validation routine.. (cf A/P 1/2) | |
| Closed | 13-Mar: C/F
20-Mar: C/F 20-Mar: See http://ealing.cyberiacafe.net/xhostintranet/creditcards/CheckCCDetails.cfm for a custom tag to check validity information. There are plenty of others in the Allaire Developers Exchange if this one doesn't suit. I've also got a basic Javascript one but there are obvious issues with relying on Javascript. Done. |
|
| A/P 6/4 | A/P 6/4 : IR to ensure PICs registration code is added to pages. (cf A/P 5/2) | |
| IR |
13-Mar: C/F 20-Mar: Closed. |
|
| A/P 7/1 | A/P 7/1 : KK put pros and cons DNS registration document into forums | |
| KK | 20-Mar: Done but still need final decision on what to do | |
| A/P 7/2 | A/P 7/2 : DC to clarify why need new root domain. | |
| Closed | 20-Mar: Closed. | |
| A/P 7/3 | A/P 7/3 : KK to register root domain when requirement clarified. | |
| Closed | 20-Mar: Closed. | |
| A/P 7/4 | A/P 7/4 : JMF/DC to send down more current version of WhatsUp | |
| JMF/DC |
Action completed What's up gold build 3.5.3 included on STUFF CD included with WebBoard 3. software box 20-Mar: Box sent. Closed 25-Mar: Can't find in Xmas box? Reopen?? |
|
| A/P 7/5 | A/P 7/5 : NL to work up procedures from existing and arrange for draft to be added to forum or intranet as soon as possible for discussion. | |
| NL |
20-Mar: First Draft done - ongoing. C/F |
|
| A/P 7/6 | A/P 7/6 : SS to obtain costs and availabilty of memorable number package from BT. | |
| SS |
20-Mar: £21 for ex gold number. Meeting agreed to go ahead and get one. C/F |
|
| A/P 7/7 | A/P 7/7 : IR to ensure VAT receipts built into ordering process (even if have to be produced manually) | |
| IR |
20-Mar: VAT debate. KK said must put VAT details in mail message. KK email IR with suggested form of words. A/P KK mail proforma VAT element to IR C/F |
|
| A/P 7/8 | A/P 7/8 : IR to email notification when site changes status to live so that CSC/KK can ensure backups/processes amended suitably. | |
| IR | 20-Mar: C/F | |
| A/P 7/9 | A/P 7/9 : CSC/KK amend processes to take account of Ealing becoming the master site. | |
| CSC/KK | 20-Mar: Pending 7/8 - C/F | |
| A/P 7/10 | A/P 7/10 : CSC/KK to get CF upgraded for the weekend | |
| Closed |
15-Mar: CF upgraded to 4.5 - couldn't find any relevant patches? 20-Mar: Done. |
|
| A/P 7/11 | A/P 7/11 : IR to complete and return directors form (and personal tax form if required).. | |
| IR | 20-Mar: Ian posting now... | |
| A/P 8/1 | A/P 8/1 : CSC to look at productising ihtml and selling on.. | |
| CSC | 27-Mar: | |
| A/P 8/2 | A/P 8/2 : KK to provide details to Dun | |
| KK | 27-Mar: | |
| A/P 8/3 | A/P 8/3 : CSC look at xhosting EMUrl front end so we can sell.... Also want a one sheet how to for each product - send to NL.. | |
| CSC | 27-Mar: | |
| A/P 8/4 | A/P 8/4 : KK to complete base build for livestats | |
| KK | 27-Mar: | |
| A/P 8/5 | A/P 8/5 : KK Check status of xsupport.xhost.co.uk | |
| KK | 27-Mar: | |
| A/P 8/6 | A/P 8/6 : KK/CSC to arrange CD load | |
|
KK/CSC |
27-Mar: | |
| New Actions this meeting | ||
|
Main discussion on readiness and what needs to be done:
Discussion on additional machines and their functions. Dotlinks, network build sharing common machine for software, cafe machnie or hub.
Pricing issues
IR Tax Office
|
||
| A/P 9/1 | A/P 9/1 : CSC to upgrade MDAC on Ealing to see if that solves the xhost database registration issue. | |
| A/P 9/2 | A/P 9/2 : KK to check PC Anywhere version 9 installed. | |
| A/P 9/3 | A/P 9/3 : JMF to send down 100m hub. | |
| A/P 9/4 | A/P 9/4 : KK add second NT boot to dotlink going to cafe | |
| A/P 9/5 | A/P 9/5 : KK to do WebBoard install | |
| A/P 9/6 | A/P 9/6 : CSC to publish CF tags for IR | |
| A/P 9/7 | A/P 9/7 : KK to check additional data transfer charges | |
| A/P 9/8 | A/P 9/8: ?? Measure bandwidth traffic | |
| A/P 9/9 | A/P 9/9: A/P ?? http://www.xhost.co.uk/optionalextra.htm check all gold surveys. | |
| A/P 9/10 | A/P 9/10: A/P CSC/NL to look at marketting words for plans | |
| A/P 9/11 | A/P 9/11: A/P DC to look at demonstration storefront | |
| A/P 9/12 | A/P 9/12: A/P KK to look at reseller words. | |
| A/P 9/13 | A/P 9/13: A/P IR to divide up site and use forums and design notes to allocate ownership | |
| A/P 9/14 | A/P 9/14: A/P SS Check site from sales perspective. | |
| A/P 9/15 | A/P 9/15: A/P All need to validate site by the end of this week!!!!!!!!!!!!!!!!!!!!!! | |
| A/P 9/16 | A/P 9/16: A/P IR document fonts used for text and images.. | |
| A/P 9/17 | A/P 9/17: A/P CSC Secure - http://www.xhost.co.uk/admin/default.htm and http://www.xhost.co.uk/support/default.htm | |